| project profile data | |
|---|---|
Area: | 1272 m² |
Construction year: | 2017 |
Planner/Contractor: | OOO Ladshaftny Design Pro |
System build-up: | Inverted roof with Separation Membrane TGV 21, Floradrain® FD 40 and Filter Sheet SF |
Zinco pioneered the first core EPD in 2020 — and has stayed ahead ever since. With current verifications by EPD Global, more than 20 standard system assemblies are now covered.